Installation of Horizontal SAA @ Tiger Brennan Drive (Darwin Sep’2015)

2017-11-22T23:51:18+11:00June 15th, 2016|

The project involved installation of two 25m vertical Model 7300 ShapeAccelArray's (SAA) to monitor settlement on the Tiger Brennan duplication project in Darwin. The SAA's were connected then connected to a remotely monitored datalogging system allowing the settlement rates to be assessed during construction. Supervising the digging of the trenches for the horizontal Model