Installation of Uretech Polyurethane Liners
Bolt Installation in Uretech Polyurethane Liners
Drilling of Uretech Polyurethane Liners
Cutting of Uretech Polyurethane Liners
Uretech Polyurethane Feeder Liners
HMA Wear Solutions Ceramatech Overview
![WEA-CS-0036 Image WEA-CS-0036 Image](https://hmagrp.com/wp-content/uploads/2020/08/WEA-CS-0036-Image.jpg)
HMA Wear Solutions has completed a major US$1.5 million contract to manufacture 279 ceramic-lined pipes – including all fasteners, gaskets, and pipe supports – for an upgrade project at the Ombilin power station in remote Sawah Luto in West Sumatra, Indonesia. This ageing power station was experiencing major issues in terms of efficiency – especially in and around its pulverised fuel delivery system, resulting in increased emissions from incomplete combustion.
![FLO-CS-0005 Image FLO-CS-0005 Image](https://hmagrp.com/wp-content/uploads/2020/08/FLO-CS-0005-Image.jpg)
The sheet was cut to size and fitted as a lining on a diversion chute coming off of a conveyor carrying dry mix cement (cement powder and sand mixed with 10 to 14mm aggregate) in to a hopper. The conveyor feeds two hoppers with half the product going to each hopper.
![FLO-CS-0005 Image FLO-CS-0005 Image](https://hmagrp.com/wp-content/uploads/2020/08/FLO-CS-0005-Image.jpg)
The sheet was cut to size and fitted as a lining on a diversion chute coming off of a conveyor carrying dry mix cement (cement powder and sand mixed with 10 to 14mm aggregate) in to a hopper. The conveyor feeds two hoppers with half the product going to each hopper.