Installation of Vertical SAA @ Mount Taupiri (New Zealand Nov’2015)

2017-11-22T23:51:17+11:00June 15th, 2016|

The project involved the installation of a 16m long vertical Model 7300 ShapeAccelArray (SAA) to monitor a potential slope failure on a sacred site in New Zealand during the construction of a new motorway. The SAA was monitored using a GSA data logging system allowing data to be easily remotely accessed. Setting up to unspool

Installation of Horizontal SAA @ Tiger Brennan Drive (Darwin Sep’2015)

2017-11-22T23:51:18+11:00June 15th, 2016|

The project involved installation of two 25m vertical Model 7300 ShapeAccelArray's (SAA) to monitor settlement on the Tiger Brennan duplication project in Darwin. The SAA's were connected then connected to a remotely monitored datalogging system allowing the settlement rates to be assessed during construction. Supervising the digging of the trenches for the horizontal Model