GEO-CS-0020
In line with Australia’s commitment to reduce carbon emissions and move towards renewable energy, Snowy 2.0 is a major project estimated to cost in the region of A$5.2 billion. Early feasibility studies investigated the viability of a tunnel linking Lake Talbingo and Lake Tantangara. Situated underground, along the tunnel would be the power station housing six turbines capable of generating 2000 megawatts. Power generation is not expected until 2025. The initial site investigation by SMEC and GHD led to HMA Geotechnical being awarded the instrumentation installation work. HMA Geotechnical began installation work in November 2017 and completed the work in February 2021