HMA GSA have been busy offsite with a large installation at the Tiger Brennan Highway duplication in Darwin. Alex and Stu were able to escape the Melbourne winter and spend two weeks on site.

The job was on a mangrove swamp just outside the city and having 5-6m salt water crocodiles watching you work does focus the mind. HMA’s Northern Territory Manager, Aamer, came on site for a couple of days training as well.

Refer to the HMA Group website for more information on GSA’s product range.