Train Loading System Upgrades
Australia Tel: +61 (0)2 4389 6191
Indonesia Tel: +62 21 3040 4422
New Zealand Tel: +64 (0)7 850 2610
South Africa Tel: +27 (0)10 900 2055
Description
HMA Materials Handling can also upgrade and retrofit real time weighing systems to existing train loading systems to increase loading performance and efficiencies.
Examples of what can be done to improve throughput and/or reliability include:
- Upgrades and replacement bins and structures
- Replacement control gates and loading chutes
- Upgrade or full replacement of hydraulic power systems
- PLC and control system upgrade
- Loading system automation
- Real time weighting loading (VTLU)