Geotechnical

HMA Geotechnical at Measurand Shape Accel Array (SAA) Technical Conference

2017-11-29T23:15:47+11:00March 9th, 2017|

HMA Geotechnical met with Measurand representatives globally to discuss marketing and technical innovations with the Shape Accel Array (SAA) product range at the 2017 Distributor ConferenceAlex Hyland represented HMA and gave a talk on two Measurand Shape Accel Array (SAA) installations he managed in New Zealand and Darwin.There are over 80,000m of Measurand Shape Accel Array (SAA)

Balai Diklat Tambang Bawah Tanah (BDTBT) – Instrument Monitoring Training and Site Visit

2017-11-22T23:51:16+11:00July 22nd, 2016|

On July 12th-15th, 2016, HMA Geotechnical received a visit from representatives of Ministry of Energy and Mineral Resources, Indonesia. The three guests were Mr. Tego Lenggono, Mr. Achmad Saepulloh, and Mr. Muhammad Roni. The aforementioned gentlemen are from Balai Diklat Tambang Bawah Tanah (Underground Mine Training Center; or BDTBT), Indonesia. BDTBT is one of

Installation of Vertical SAA @ Mount Taupiri (New Zealand Nov’2015)

2017-11-22T23:51:17+11:00June 15th, 2016|

The project involved the installation of a 16m long vertical Model 7300 ShapeAccelArray (SAA) to monitor a potential slope failure on a sacred site in New Zealand during the construction of a new motorway. The SAA was monitored using a GSA data logging system allowing data to be easily remotely accessed. Setting up to unspool

Installation of Horizontal SAA @ Tiger Brennan Drive (Darwin Sep’2015)

2017-11-22T23:51:18+11:00June 15th, 2016|

The project involved installation of two 25m vertical Model 7300 ShapeAccelArray's (SAA) to monitor settlement on the Tiger Brennan duplication project in Darwin. The SAA's were connected then connected to a remotely monitored datalogging system allowing the settlement rates to be assessed during construction. Supervising the digging of the trenches for the horizontal Model